SchedulingComing
Cadence. P6 power. Ten times easier.
Cadence builds the schedule step by step from the drawings and the estimate you already have. The activities, the durations and the order, without starting from a blank Gantt chart.
Replaces: Primavera P6, and the schedule in Excel.
What Cadence does
Step by step
A guided schedule, one decision at a time, the way Tally guides an estimate.
From the blueprints
AI reads the drawings for the areas, floors and phases the work moves through.
Durations from the estimate
Quantities and crews from Tally become how long each activity takes.
The critical path, plain
What drives the finish date, shown plainly, and what slips if something does.
Updates in minutes
Mark progress, and Cadence moves what depends on it.
Shares cleanly
A schedule your owner and your subs can read, without a P6 license.
Step by step
How a job will go through Cadence.
- 1Start from the estimateThe scope, quantities and general conditions schedule are already there.
- 2Confirm the phasesFloors, areas and sequence, read from the drawings.
- 3Check the durationsSuggested from the quantities; you set the crews.
- 4Lock the planThe baseline, with the critical path shown.
- 5Update as you buildProgress in, new dates out.
Works with the other three
Cadence works on its own. With the others, nothing gets retyped.