SchedulingComing

Cadence. P6 power. Ten times easier.

Cadence builds the schedule step by step from the drawings and the estimate you already have. The activities, the durations and the order, without starting from a blank Gantt chart.

Replaces: Primavera P6, and the schedule in Excel.

What Cadence does

Step by step

A guided schedule, one decision at a time, the way Tally guides an estimate.

From the blueprints

AI reads the drawings for the areas, floors and phases the work moves through.

Durations from the estimate

Quantities and crews from Tally become how long each activity takes.

The critical path, plain

What drives the finish date, shown plainly, and what slips if something does.

Updates in minutes

Mark progress, and Cadence moves what depends on it.

Shares cleanly

A schedule your owner and your subs can read, without a P6 license.

Step by step

How a job will go through Cadence.

  1. 1
    Start from the estimateThe scope, quantities and general conditions schedule are already there.
  2. 2
    Confirm the phasesFloors, areas and sequence, read from the drawings.
  3. 3
    Check the durationsSuggested from the quantities; you set the crews.
  4. 4
    Lock the planThe baseline, with the critical path shown.
  5. 5
    Update as you buildProgress in, new dates out.

Be first on Cadence.